Case Studies

Case Study

Client:

Constructive Workspace

Site Location:

Royal College of Physicians, Regents Park, London

Date:

January 2009 – June 2009

Project Value:

£250,000.00

Project Details:

Constructive Workspace approached us to design a bespoke air conditioning system to complement the new office refurbishment for the back of house area at the Royal College of Physicians – at the time cooled by an existing Daikin Water Chiller, approximately 25 years old. The client wanted a more user friendly, flexible and economic way to provide cooling and heating to their space.

System Description:

We selected a Daikin VRV 111 (three-pipe) Heat Recovery System which allowed the flexibility of installing one system per phase of the refurbishment. Roundflow ceiling cassettes were selected for each of the office areas, and localised wall-mounted controllers installed to allow occupants individual control of each area. A Daikin packaged Water Chiller was selected to provide cooling to the new Comms Room APC Cooling Racks. Various Daikin Split Systems were also utilised for the Print Room and small Server Rooms.


Case Study

Client:

Rightmove

Site Location:

Grafton House, Milton Keynes, Bucks

Date:

Project Value:

£41,000.00

Project Details:

The client occupied the top floor of Grafton House – predominately a call centre which mainly consisted of an open plan office environment incorporating meeting and training rooms. The client’s problem was an unacceptable build up of temperature in the space during warm periods.

System Description:

We selected Fujitsu Inverter-driven above-the-ceiling ducted units, wall mounts and cassette type heat pump split systems to provide the cooling required to each of the areas on the floor. The client also had the option of using the split systems to boost the heating system if needed. The project was completed with minimum disruption to the client with some of the installation being carried out outside normal office hours.


Case Study

Client:

Constructive Workspace

Site Location:

Macmillan Cancer Support, London

Date:

March 2009 – July 2009

Project Value:

£120,000.00

Project Details:

This project required air conditioning to be installed on the 9th and 11th floors of the client’s existing building. The particular challenge this posed was due to the unusual shape of the building and the fact that the client had no suspended ceilings.

System Description:

We selected a Mitsubishi Heavy Industries VRF system for this application comprising ceiling cassette units. All of the services were installed within trunking and each cassette unit case was boxed in to be as aesthetically pleasing as possible.


Case Study

Client:

Rightmove

Site Location:

Soho Square, London

Date:

Project Value:

£13,700.00

Project Details:

The client took possession of two floors of an existing office building in Soho Square, London and this incorporated their main IT Department. The client required cooling to the new Comms Room.

System Description:

We selected Daikin Wall Mounted Split Systems for the application comprising three FAQ100 systems with Auto Changeover/Lead Lag Control Panel.


Reduce your Carbon Footprint

Speak to us about our 0% rated products

Suppliers
Fujitsu
Daikin
Toshiba
Suppliers
Mitsubishi Electric
Daikin
Toshiba
HVCA